Work Day - 4-16-2022
It was a very productive day on Saturday, April 16, 2022. Volunteers removed a cast iron plumbing stack running from the basement through the roof. Then the leaky tarps on the roof were replaced. These tarps will keep out the weather until a new permanent roof is installed.
Down in the basement, volunteers removed old electrical boxes and wires, pulled nails and cleared away dirt and debris. We now have a clean and dry area to temporarily store construction materials.