Work Day - 7-30-2022
A small group of volunteers worked on Saturday, July 30th. Drywall and insulation were removed from a first-floor wall and the debris was hauled to a dump truck. On the outside, newer wood siding was removed from under the eaves on the back of the house. This exposed the original 186-year-old siding which was in remarkably good shape!