Work Day - 7-9-2022
All of the recent work done inside the Oviatt house had left the first floor in somewhat of a disarray. So Saturday, July 9th was spent organizing and cleaning. Nails were pulled from boards and the wood worth keeping was moved into the basement for storage. Metal items (old copper wire, plumbing, electrical boxes, etc.) were sorted and staged for recycling. Floors were swept and vacuumed. It was a very productive day!