Work Week - 5-29-2023
A small group of volunteers worked on three unrelated tasks this week. On the first floor, a stud-wall was built around the new ductwork leading from the basement to the second floor. In the basement, a floor joist was added under the floor next to the back door to provide additional support to the flooring. And on the second floor, we began patching the flooring where a bathroom was previously located.