Work Week - 10-3-2022
The week of October 3rd was spent getting the exterior siding ready for priming and painting.
The vast hole in the southern wall created by the removal of the chimney was resided. This task included moving a window back to its original location.
Old paint was stripped from window and door frames. Old paint on the siding was wetted and scraped.