Work Week - 6-12-2023
During the week of June 23rd, two HVAC ducts were re-routed to provide a better distribution of heating and air-conditioning to the first floor. Then new flooring was installed near the back door.
Additionally, patches were applied to the floor where the 1950's hearth had been located and where a short non-original wall had previously been removed.