Work Week - 5-8-2023
This week, a string of great-weather days took us outside to do some exterior work.
Skirt boards were installed on the west and north sides of the house, replacing original boards that had rotted beyond repair. The non-original side door was removed and framed in. Then siding was pieced in to replace missing or broken siding.
Skirt boards were installed on the west and north sides of the house, replacing original boards that had rotted beyond repair. The non-original side door was removed and framed in. Then siding was pieced in to replace missing or broken siding.